Guides / Driveway permits
Driveway Permits Bendigo: Road Reserve Fees and Plans
Bendigo’s vehicle crossing application sits within its works-in-the-road-reserve process. The fee depends on where the work occurs and whether it is minor or major. The form also asks about nearby trees and stormwater, but those questions are not a substitute for a crossing design.
Official sources checked 14 October 2026. This is an independent referral guide, not a council application or approval.
Use the vehicle crossing work category
The City of Greater Bendigo permit form covers vehicle crossing and nature-strip landscaping work in the reserve. Select the actual work category, give the address and proposed dates, and identify the applicant and works manager. An online application or downloaded hard-copy application is available. If the project includes landscaping as well as concrete, describe both instead of assuming the vehicle crossing label covers every activity.
2026/27 fees distinguish minor and major works
The table below reproduces the current municipal-road or non-arterial-state-road categories, checked 14 October 2026. All amounts exclude GST. Work not conducted on the roadway, shoulder or pathway is $103.60 for either minor or major works. Work conducted on those surfaces is $160.60 for minor works or $405.80 for major works. Confirm whether council classifies your proposal as minor or major; the table does not establish one fixed driveway fee.
| 2026/27 work location | Minor works, ex GST | Major works, ex GST |
|---|---|---|
| Not on roadway, shoulder or pathway | $103.60 | $103.60 |
| On roadway, shoulder or pathway | $160.60 | $405.80 |
A sketch must show the surrounding assets
The form asks for a sketch of the work and all assets nearby, including trees, landscaping, pavement, kerb and channel, footpaths, drains, service authority assets and private assets. A neat hand drawing or house plan can be used. Show the crossing in its street context; a rectangle with only length and width does not explain which assets the work might affect.
The tree and stormwater questions are not design setbacks
The form asks whether stormwater is within 1 metre of the crossing and whether trees are within 2 metres. Answer those site-information questions accurately. They are not published engineering setback rules or automatic permission to build just outside those distances. The gas and water conduit question belongs on the same site sketch. Ask for the applicable crossing specification before deciding levels, concrete thickness or reinforcement.
Plan for the processing warning and permit window
Council aims to process applications within 20 business days but currently warns that high volumes are causing longer waits. Unless exceptional circumstances apply, permits are not issued for longer than one month. Keep the proposed start and end dates realistic and check them against the issued consent. Booking a pour while the assessment is still open can leave the construction schedule outside the eventual permit period.
Make responsibility visible before comparing quotes
The application requires works-manager insurance information and a site contact as well as the applicant details. Ask who supplies those documents, manages the reserve work and reinstates affected assets. Separate the council application category from concrete supply, excavation and private driveway finishing. The national price example in the cost guide does not include a locally assessed permit category or establish the design needed on Bendigo’s public frontage.
Reserve-work form questions
Is Bendigo’s road-reserve fee always $103.60?
No. For 2026/27, work away from the roadway, shoulder and pathway is $103.60. Work on those surfaces is $160.60 for minor works or $405.80 for major works. All amounts exclude GST.
Do the form’s tree and stormwater distances set construction clearances?
No. The form asks about trees within 2 metres and stormwater within 1 metre. Those are site-information questions, not a published engineering setback standard.
Will the application be decided within 20 business days?
Council states a 20-business-day processing aim but currently warns that high application volumes are causing longer waits. It is not a guaranteed approval date.
How long can the work permit run?
The form says permits ordinarily are not issued for longer than one month, unless exceptional circumstances apply. Check the dates and conditions of the issued permit.
Source for these answers: the council guidance. Checked 14 October 2026.
For the work inside the boundary, see private driveway planning. Compare the concrete cost and scope guide and repair and resurfacing options when describing the enquiry.